 ======Gesture Controls for Raven Robot====== ======Gesture Controls for Raven Robot======
-**Last updated: Feb 19, 12:30pm** 
- 
  
 ======Summary====== ======Summary======
Line 31: Line 29:
 ======Deliverables====== ======Deliverables======
    
-  * **Minimum:​** ​(Expected by April 19)+  * **Minimum:​** ​COMPLETE
     - SAW Wrapper for 3Gear + documentation     - SAW Wrapper for 3Gear + documentation
     - CISST to ROS interface + documentation     - CISST to ROS interface + documentation
-    - Simple frames moving in Gazebo ​(demonstration)+    - Simple frames moving in rviz(demonstration)
  
-  * **Expected:​** (Expected by April 26)+  * **Expected:​** (Expected by May 9)
     - 3Gear to CISST interface + documentation     - 3Gear to CISST interface + documentation
     - CISST to ROS interface + documentation     - CISST to ROS interface + documentation
Line 42: Line 40:
     - Show control of Raven Simulator using gestures (demonstration)     - Show control of Raven Simulator using gestures (demonstration)
  
-  * **Maximum:​** (Expected by May 3)+  * **Maximum:​** (No longer expected)
     - ROS to Raven robot interface (all libraries + documentation)     - ROS to Raven robot interface (all libraries + documentation)
     - Show control of Raven Robot using gestures (demonstration)     - Show control of Raven Robot using gestures (demonstration)
Line 80: Line 78:
 Resolution Plan: Ask mentors for help\\ Resolution Plan: Ask mentors for help\\
 Resolve by: <​del>​March 25</​del>​ April 10\\ Resolve by: <​del>​March 25</​del>​ April 10\\
-Resolved: ​No\\+Resolved: ​YES\\
 Fallback plan: Learn to network computers?​\\ Fallback plan: Learn to network computers?​\\
  
Line 98: Line 96:
 Resolution Plan: Ask mentors for help\\ Resolution Plan: Ask mentors for help\\
 Resolve by: April 3\\ Resolve by: April 3\\
-Resolved: ​NO\\+Resolved: ​YES\\
 Fallback plan: None, critical.\\ Fallback plan: None, critical.\\
  
Line 104: Line 102:
 Resolution Plan: Ask Kel (who has admin access to the computer\\ Resolution Plan: Ask Kel (who has admin access to the computer\\
 Resolve by: April 10\\ Resolve by: April 10\\
-Resolved: ​NO\\+Resolved: ​YES\\
 Fallback plan: None, critical\\ Fallback plan: None, critical\\
  
Line 116: Line 114:
     * Planned Date: March 11     * Planned Date: March 11
     * Expected Date: March 11     * Expected Date: March 11
-    * Status: ​In Progress+    * Status: ​Complete
   - Milestone name:  3Gear to CISST code + documentation   - Milestone name:  3Gear to CISST code + documentation
-    * Planned Date: April 1 +    * Planned Date: April 15 
-    * Expected Date: April 1 +    * Expected Date: April 26 
-    * Status: ​In Progress+    * Status: ​Complete
   - Milestone name:  CISST to ROS code + documentation   - Milestone name:  CISST to ROS code + documentation
     * Planned Date: April 1     * Planned Date: April 1
-    * Expected Date: April 1+    * Expected Date: May 3
     * Status: In Progress     * Status: In Progress
   - Milestone name:  ROS to Raven Simulator code + documentation   - Milestone name:  ROS to Raven Simulator code + documentation
     * Planned Date: April 19     * Planned Date: April 19
-    * Expected Date: April 19 +    * Expected Date: April 26 
-    * Status: ​Planned+    * Status: ​In Progress
   - Milestone name:  3Gear to Raven Simulator Demonstration   - Milestone name:  3Gear to Raven Simulator Demonstration
     * Planned Date: April 26     * Planned Date: April 26
-    * Expected Date: April 26+    * Expected Date: May 6
     * Status: Planned     * Status: Planned
   - Milestone name:  ROS to Raven Robot code + documentation   - Milestone name:  ROS to Raven Robot code + documentation
     * Planned Date: April 29     * Planned Date: April 29
-    * Expected Date: April 29 +    * Expected Date: No longer expected 
-    * Status: ​Planned+    * Status: ​N/A
   - Milestone name:  3Gear to Raven Simulator Demonstration   - Milestone name:  3Gear to Raven Simulator Demonstration
     * Planned Date: May 3     * Planned Date: May 3
-    * Expected Date: May 3+    * Expected Date: May 6
     * Status: Planned     * Status: Planned
 ======Reports and presentations====== ======Reports and presentations======
Line 150: Line 148:
   * Project Checkpoint   * Project Checkpoint
     * {{:​courses:​446:​2013:​446-2013-07:​checkpoint_presentation.pdf|Project checkpoint presentation}}     * {{:​courses:​446:​2013:​446-2013-07:​checkpoint_presentation.pdf|Project checkpoint presentation}}
 +    * {{:​courses:​446:​2013:​446-2013-07:​checkpoint_ii_presentation.pdf|Checkpoint II}}
   * Paper Seminar Presentations   * Paper Seminar Presentations
     * {{:​courses:​446:​2013:​446-2013-07:​cis2seminarpaper.pdf|Alan'​s Seminar Report}}     * {{:​courses:​446:​2013:​446-2013-07:​cis2seminarpaper.pdf|Alan'​s Seminar Report}}
Line 156: Line 155:
     * {{:​courses:​446:​2013:​446-2013-07:​seminar_presentation_-_kristine.pdf|Seminar Presentation for Gesture-Based Input Method}}     * {{:​courses:​446:​2013:​446-2013-07:​seminar_presentation_-_kristine.pdf|Seminar Presentation for Gesture-Based Input Method}}
   * Project Final Presentation   * Project Final Presentation
-    * {{:​courses:​446:​2013:​446-2013-X:final_poster_pdf.pdf|PDF of Poster}}+    * {{:​courses:​446:​2013:​446-2013-07:projectposter.pdf|PDF of Poster}}
   * Project Final Report   * Project Final Report
-    * {{:​courses:​446:​2013:​446-2013-X:final_report.pdf|Final Report}} +    * {{:​courses:​446:​2013:​446-2013-07:finalreport.pdf|Final Report}} 
-    * links to any appendices or other material+    * {{:​courses:​446:​2013:​446-2013-07:​usersmanualandinstallationguide.pdf|User'​s Manual and Installation Guide}}
 ======Project Bibliography======= ======Project Bibliography=======
   * M.J.H. Lum, J. Rosen, T.S. Lendvay, M.N. Sinanan, B. Hannaford, '​Effect of Time Delay on TeleSurgical Performance,'​ IEEE International Conference on Robotics and Automation (ICRA), 2009.   * M.J.H. Lum, J. Rosen, T.S. Lendvay, M.N. Sinanan, B. Hannaford, '​Effect of Time Delay on TeleSurgical Performance,'​ IEEE International Conference on Robotics and Automation (ICRA), 2009.
Line 168: Line 167:
   * http://​www.ros.org/​wiki/​   * http://​www.ros.org/​wiki/​
 ======Other Resources and Project Files====== ======Other Resources and Project Files======
-Here give list of other project files (e.g., source ​code) associated with the project If these are online give a link to an appropriate external repository or to uploaded media files under this name space+Source ​code is available under the Robotorium'​s SVN: https://svn.lcsr.jhu.edu/​robotorium/​trunk/​apps/​3gear/​ 
- +A video demo of our system at workhttps://​www.dropbox.com/​s/​1i7au9m3ti63fjh/​20130513_132053.mp4