Differences

This shows you the differences between two versions of the page.

Link to this comparison view

courses:446:2013:446-2013-07:446-2013-07 [2013/04/30 13:37]
ksarnle1@johnshopkins.edu [Dependencies]
courses:446:2013:446-2013-07:446-2013-07 [2013/05/13 13:55] (current)
ksarnle1@johnshopkins.edu [Other Resources and Project Files]
Line 1: Line 1:
 ======Gesture Controls for Raven Robot====== ======Gesture Controls for Raven Robot======
-**Last updated: April 2, 2013, 3:00pm** 
- 
  
 ======Summary====== ======Summary======
Line 31: Line 29:
 ======Deliverables====== ======Deliverables======
    
-  * **Minimum:** (Expected by May 3)+  * **Minimum:** COMPLETE
     - SAW Wrapper for 3Gear + documentation     - SAW Wrapper for 3Gear + documentation
     - CISST to ROS interface + documentation     - CISST to ROS interface + documentation
-    - Simple frames moving in Gazebo (demonstration)+    - Simple frames moving in rviz(demonstration)
  
-  * **Expected:** (Expected by May 6)+  * **Expected:** (Expected by May 9)
     - 3Gear to CISST interface + documentation     - 3Gear to CISST interface + documentation
     - CISST to ROS interface + documentation     - CISST to ROS interface + documentation
Line 119: Line 117:
   - Milestone name:  3Gear to CISST code + documentation   - Milestone name:  3Gear to CISST code + documentation
     * Planned Date: April 15     * Planned Date: April 15
-    * Expected Date: April 15 +    * Expected Date: April 26 
-    * Status: In Progress+    * Status: Complete
   - Milestone name:  CISST to ROS code + documentation   - Milestone name:  CISST to ROS code + documentation
     * Planned Date: April 1     * Planned Date: April 1
-    * Expected Date: April 15+    * Expected Date: May 3
     * Status: In Progress     * Status: In Progress
   - Milestone name:  ROS to Raven Simulator code + documentation   - Milestone name:  ROS to Raven Simulator code + documentation
     * Planned Date: April 19     * Planned Date: April 19
-    * Expected Date: April 19+    * Expected Date: April 26
     * Status: In Progress     * Status: In Progress
   - Milestone name:  3Gear to Raven Simulator Demonstration   - Milestone name:  3Gear to Raven Simulator Demonstration
     * Planned Date: April 26     * Planned Date: April 26
-    * Expected Date: April 26+    * Expected Date: May 6
     * Status: Planned     * Status: Planned
   - Milestone name:  ROS to Raven Robot code + documentation   - Milestone name:  ROS to Raven Robot code + documentation
     * Planned Date: April 29     * Planned Date: April 29
-    * Expected Date: April 29 +    * Expected Date: No longer expected 
-    * Status: Planned+    * Status: N/A
   - Milestone name:  3Gear to Raven Simulator Demonstration   - Milestone name:  3Gear to Raven Simulator Demonstration
     * Planned Date: May 3     * Planned Date: May 3
-    * Expected Date: May 3+    * Expected Date: May 6
     * Status: Planned     * Status: Planned
 ======Reports and presentations====== ======Reports and presentations======
Line 150: Line 148:
   * Project Checkpoint   * Project Checkpoint
     * {{:courses:446:2013:446-2013-07:checkpoint_presentation.pdf|Project checkpoint presentation}}     * {{:courses:446:2013:446-2013-07:checkpoint_presentation.pdf|Project checkpoint presentation}}
 +    * {{:courses:446:2013:446-2013-07:checkpoint_ii_presentation.pdf|Checkpoint II}}
   * Paper Seminar Presentations   * Paper Seminar Presentations
     * {{:courses:446:2013:446-2013-07:cis2seminarpaper.pdf|Alan's Seminar Report}}     * {{:courses:446:2013:446-2013-07:cis2seminarpaper.pdf|Alan's Seminar Report}}
Line 156: Line 155:
     * {{:courses:446:2013:446-2013-07:seminar_presentation_-_kristine.pdf|Seminar Presentation for Gesture-Based Input Method}}     * {{:courses:446:2013:446-2013-07:seminar_presentation_-_kristine.pdf|Seminar Presentation for Gesture-Based Input Method}}
   * Project Final Presentation   * Project Final Presentation
-    * {{:courses:446:2013:446-2013-X:final_poster_pdf.pdf|PDF of Poster}}+    * {{:courses:446:2013:446-2013-07:projectposter.pdf|PDF of Poster}}
   * Project Final Report   * Project Final Report
-    * {{:courses:446:2013:446-2013-X:final_report.pdf|Final Report}} +    * {{:courses:446:2013:446-2013-07:finalreport.pdf|Final Report}} 
-    * links to any appendices or other material+    * {{:courses:446:2013:446-2013-07:usersmanualandinstallationguide.pdf|User's Manual and Installation Guide}}
 ======Project Bibliography======= ======Project Bibliography=======
   * M.J.H. Lum, J. Rosen, T.S. Lendvay, M.N. Sinanan, B. Hannaford, 'Effect of Time Delay on TeleSurgical Performance,' IEEE International Conference on Robotics and Automation (ICRA), 2009.   * M.J.H. Lum, J. Rosen, T.S. Lendvay, M.N. Sinanan, B. Hannaford, 'Effect of Time Delay on TeleSurgical Performance,' IEEE International Conference on Robotics and Automation (ICRA), 2009.
Line 168: Line 167:
   * http://www.ros.org/wiki/   * http://www.ros.org/wiki/
 ======Other Resources and Project Files====== ======Other Resources and Project Files======
-Here give list of other project files (e.g., source code) associated with the project If these are online give a link to an appropriate external repository or to uploaded media files under this name space+Source code is available under the Robotorium's SVN: https://svn.lcsr.jhu.edu/robotorium/trunk/apps/3gear/ 
- +A video demo of our system at workhttps://www.dropbox.com/s/1i7au9m3ti63fjh/20130513_132053.mp4
-NOTEAsk Kell where he wants us to keep repositories+
courses/446/2013/446-2013-07/446-2013-07.1367343454.txt.gz · Last modified: 2013/04/30 13:37 by ksarnle1@johnshopkins.edu




ERC CISST    LCSR    WSE    JHU