courses:446:2013:446-2013-4:metal_artifact_removal_in_c-arm_cone-beam_ct [2013/04/08 13:13]
ccaymar1@johnshopkins.edu [Technical Approach]
courses:446:2013:446-2013-4:metal_artifact_removal_in_c-arm_cone-beam_ct [2013/05/08 21:12] (current)
ccaymar1@johnshopkins.edu [Metal Artifact Removal in C-Arm Cone Beam CT]
Line 1: Line 1:
 ======Metal Artifact Removal in C-Arm Cone Beam CT====== ======Metal Artifact Removal in C-Arm Cone Beam CT======
-Last checked: 04/01/13, 10:00 pm+Last checked: 05/08/13, 10:00 pm
  
 ======Summary====== ======Summary======
Line 77: Line 77:
 === Phantom Construction === === Phantom Construction ===
   * **Dependent variables in metal fillings**    * **Dependent variables in metal fillings** 
-    - diameter, volumesphericity, density, proximity to simulated vasculature structures, number and shape of coils and clips+    - for spheres and clips: quantity, diameter, materiallocation in relation to contrast vasculature and anatomy 
 +    - for clips and stents: quantity, material, diameter, length 
  
   * **Dependent variables in simulated vasculature**   * **Dependent variables in simulated vasculature**
     - number of vessels, contrast, volume, length, shape, material (silicon, brain-equivalent jello, among others), location in the brain representative of various anatomical structures including berry aneurysms, taking into consideration areas of the brain where aneurysms are most commonly found.     - number of vessels, contrast, volume, length, shape, material (silicon, brain-equivalent jello, among others), location in the brain representative of various anatomical structures including berry aneurysms, taking into consideration areas of the brain where aneurysms are most commonly found.
  
-Manipulation of these variables will produce wanted measurable parameters (such as attenuation and contrast). Further investigation will be done to find the most efficient and effective way to construct these phantoms. +Manipulation of these variables will produce wanted measurable parameters (such as attenuation and contrast). 
 === Image Acquisition === === Image Acquisition ===
-  * **Dependent variables in both systems**  +  * **Dependent variables in imaging systems**  
-    - Energy of beam (kVp), number of projections, dose, tube current, z-coverage (FOV) +    - Energy of beam (kVp), number of projections, z-coverage (FOV)
- +
-The Zeego/Axiom Artis Zee offers additional dependent variables (such as angulated-source detector orbits and acquisition modes). Further investigation will be done to acquire an extensive list of dependent and measurable parameters and their effects on image acquisition.+
  
 +All scans were performed on a C-arm Cone-Beam Axiom Artis Zee (Axiom Artis Zeego, Siemens Medical Solutions, Elangen, Germany) with a standard DynaCT Head 20s 70keV acquisition. 
  
 === Data Analysis === === Data Analysis ===
   * **Image quality**    * **Image quality** 
-    - Measurable parameters: Contrast resolution, Signal-to-noise ratio, Spatial resolution +    - Measurable parameters: Contrast resolution (CNR), resolution, noise std 
-    - Artifact magnitude: we will develop a parameter that will quantify the degradation of the background and surrounding structures caused by the presence of a metal artifact.+    - Artifact magnitude with selected ROI (region of interest)
  
   * **Segmentation accuracy**   * **Segmentation accuracy**
Line 148: Line 147:
  
   - Milestone name:  Construction of first-stage Phantom [metal sphere]   - Milestone name:  Construction of first-stage Phantom [metal sphere]
-    * Planned Date: 2/17-2/23 
     * Expected Date: 3/2     * Expected Date: 3/2
     * Status: completed      * Status: completed 
-  - Milestone name:  First-stage image acquisition in experimental bench 
-    * Planned Date: 2/24-3/2 
-    * Expected Date: 3/9 
-    * Status: completed 
   - Milestone name:  First-stage image acquisition in Zeego   - Milestone name:  First-stage image acquisition in Zeego
-    * Planned Date: 3/3-3/9 
     * Expected Date: 3/23     * Expected Date: 3/23
     * Status: completed     * Status: completed
-  - Milestone name:  Construction of second-stage Phantom [coil and/or clip] +  - Milestone name:  Construction of second-stage Phantom [stent and coils]
-    * Planned Date: 3/24-3/30+
     * Expected Date: 3/30     * Expected Date: 3/30
-    * Status: incomplete +    * Status: completed
-  - Milestone name:  Second-stage image acquisition in experimental bench +
-    * Planned Date: 4/1-4/6 +
-    * Expected Date: 4/13 +
-    * Status: incomplete+
   - Milestone name:  Second-stage image acquisition in Zeego   - Milestone name:  Second-stage image acquisition in Zeego
-    * Planned Date: 4/1-4/6 
     * Expected Date: 4/20     * Expected Date: 4/20
-    * Status: incomplete +    * Status: completed 
-  - Milestone name:  Construction of third-stage Phantom [ONYX (liquid embolic system)+  - Milestone name:  Construction of third-stage Phantom [liquid embolus
-    * Planned Date: 4/14-4/20+    * Expected Date: 4/13 
 +    * Status: complete  
 +  Milestone name:  Third-stage image acquisition in Zeego
     * Expected Date: 4/20     * Expected Date: 4/20
-    * Status: incomplete +    * Status: complete 
-  - Milestone name:  Third-stage image acquisition in experimental bench +  - Milestone name:  Construction of fourth-stage Phantom [clip]
-    * Planned Date: 4/21-4/27+
     * Expected Date: 4/27     * Expected Date: 4/27
-    * Status: incomplete  +    * Status: complete  
-  - Milestone name:  Third-stage image acquisition in Zeego +  - Milestone name:  Fourth-stage image acquisition in Zeego 
-    * Planned Date: 4/21-4/27 +    * Expected Date: 5/04
-    * Expected Date: 5/08+
     * Status: incomplete     * Status: incomplete
-**Schedule**+ 
 +**Original Schedule**
  
 {{ :courses:446:2013:446-2013-4:schedule.png?600 |}} {{ :courses:446:2013:446-2013-4:schedule.png?600 |}}
 +
 +**Revised Schedule**
 +
 +{{ :courses:446:2013:446-2013-4:newschedule.png?600 |}}
 ======Reports and presentations====== ======Reports and presentations======
  
Line 197: Line 189:
   * Project Checkpoint   * Project Checkpoint
     * {{:courses:446:2013:446-2013-4:checkpoint.pdf|Checkpoint Presentation}}     * {{:courses:446:2013:446-2013-4:checkpoint.pdf|Checkpoint Presentation}}
 +    * {{:courses:446:2013:446-2013-4:secondcheckpoint.pptx| Quick Checkpoint Presentation}}
   * Project Reports   * Project Reports
-    * {{:courses:446:2013:446-2013-4:phantom_construction.pdf|Phantom Construction Report}} +    * {{:courses:446:2013:446-2013-4:phantom-con.pdf|Phantom construction and Image acquisition report}} 
-    * {{:courses:446:2013:446-2013-4:data_analysis.pdf|MAR application Data Analysis Report}}+    * {{:courses:446:2013:446-2013-4:data-an.pdf|MAR application and Data analysis report}}
     * {{:courses:446:2013:446-2013-4:firstphantom_geometricartifacts_.pdf|First Phantom Images (with Geometric Artifacts)}}     * {{:courses:446:2013:446-2013-4:firstphantom_geometricartifacts_.pdf|First Phantom Images (with Geometric Artifacts)}}
 +    * {{:courses:446:2013:446-2013-4:rsna_abstract_images.pdf| Results }}
   * Paper Seminar Presentations   * Paper Seminar Presentations
     * {{:courses:446:2013:446-2013-4:paperseminar_cay_.pdf|Paper Seminar, Cay-Martinez}}     * {{:courses:446:2013:446-2013-4:paperseminar_cay_.pdf|Paper Seminar, Cay-Martinez}}
Line 209: Line 203:
     * {{:courses:446:2013:446-2013-4:seminar_critical_review.pdf|Paper Seminar, Wells}}     * {{:courses:446:2013:446-2013-4:seminar_critical_review.pdf|Paper Seminar, Wells}}
   * Project Final Presentation   * Project Final Presentation
-    * {{:courses:446:2013:446-2013-X:final_poster_pdf.pdf|PDF of Poster}}+    * {{:courses:446:2013:446-2013-4:projectposter.pdf|Poster}} 
 +    * {{:courses:446:2013:446-2013-4:group_4_cis_teaser_slides.pptx|Teaser}}
   * Project Final Report   * Project Final Report
-    * {{:courses:446:2013:446-2013-X:final_report.pdf|Final Report}} +    * {{:courses:446:2013:446-2013-4:final_paper.pdf|Final Report}} 
-    * links to any appendices or other material+    
  
-Materials last updated: 04/01 10:00pm+Materials last updated: 04/29 7:00pm
 ======Project Bibliography======= ======Project Bibliography=======
    
Line 230: Line 225:
  
   * MATLAB code for ROI selection and value acquisition from DICOM images   * MATLAB code for ROI selection and value acquisition from DICOM images
 +  * {{:courses:446:2013:446-2013-4:cis_group_4_matlab_scripts.zip|Zip file}}
 +