courses:456:2022:projects:456-2022-17:project-17 [2022/03/17 17:48] – [Dependencies] wwang153courses:456:2022:projects:456-2022-17:project-17 [2022/05/17 16:36] (current) – [Summary] wwang153
Line 1: Line 1:
 ======Actuation Design for Loop Snare Operation in Eye Surgery====== ======Actuation Design for Loop Snare Operation in Eye Surgery======
-**Last updated: 02/22/2022 18:37**+**Last updated: 04/20/2022 18:37**
  
  
Line 16: Line 16:
  
 This is the picture of the current design of the Proof-of-concept. This is the picture of the current design of the Proof-of-concept.
-{{ :courses:456:2022:projects:456-2022-17:img_2022.jpg?200 |}}+{{ :courses:456:2022:projects:456-2022-17:system_setup.jpg?400 |}}
  
  
Line 41: Line 41:
 ======Deliverables====== ======Deliverables======
    
-  * **Minimum:** (Expected by 03/15/2022)+  * **Minimum:** (Expected by 03/25/2022)
     - Design and construct a hardware platform for proof-of-concept     - Design and construct a hardware platform for proof-of-concept
     - Test the proof-of-concept prototype in a gel ball as a replica of the eye     - Test the proof-of-concept prototype in a gel ball as a replica of the eye
Line 64: Line 64:
 {{ :courses:456:2022:projects:456-2022-17:motor_control.png?600 |}} {{ :courses:456:2022:projects:456-2022-17:motor_control.png?600 |}}
 Here is a picture of controlling the motor via the EPOS studio.  The actual value and the demand value are either the same or very close, which can be concluded as these hold accurate results that can be safely used in the future iteration of design. Here is a picture of controlling the motor via the EPOS studio.  The actual value and the demand value are either the same or very close, which can be concluded as these hold accurate results that can be safely used in the future iteration of design.
 +
 +The next level of controlling the actuators will use a team-developed python package.  There are two types of control algorithms.  The first one is the keyboard control, which is using WASD to control the motors and stepper motors.  The other one is to use a GUI to control those components.  The preferred one is the GUI.  The GUI provides functions to control the EPOS motors by encoder position, in which the user can command the position of the EPOS motors by filling in the entry of the needed position. The following figure is the GUI window.
 +
 +{{ :courses:456:2022:projects:456-2022-17:gui_prompt.png?400 |}}
 +
 +This GUI should provide all the interface needed for the follow-up functions that needed to be implemented. 
 ======Dependencies====== ======Dependencies======
  
Line 76: Line 82:
     * Planned Date: 03/15/2022     * Planned Date: 03/15/2022
     * Expected Date: 03/25/2022     * Expected Date: 03/25/2022
-    * Status: On time+    * Status: Finished
   - Milestone name:  Expected prototype   - Milestone name:  Expected prototype
     * Planned Date: 04/15/2022     * Planned Date: 04/15/2022
     * Expected Date: 04/15/2022     * Expected Date: 04/15/2022
-    * Status: Not started+    * Status: Finished
   - Milestone name:  Maximum prototype   - Milestone name:  Maximum prototype
     * Planned Date: 05/01/2022     * Planned Date: 05/01/2022
     * Expected Date: 05/01/2022     * Expected Date: 05/01/2022
-    * Status: Not started +    * Status: Started and changed due to introduce the stepper motors.
-]+
 ======Reports and presentations====== ======Reports and presentations======
  
Line 93: Line 98:
   * Project Background Reading    * Project Background Reading 
     * See Bibliography below for links.     * See Bibliography below for links.
 +    * Background Reading Report:
 +    * {{ :courses:456:2022:projects:456-2022-17:background_reading_report.pdf |}}
   * Project Checkpoint   * Project Checkpoint
     * {{ :courses:456:2022:projects:456-2022-17:checkpoint_pre.pdf |}}     * {{ :courses:456:2022:projects:456-2022-17:checkpoint_pre.pdf |}}
   * Paper Seminar Presentations   * Paper Seminar Presentations
-    * here provide links to all seminar presentations+    * {{ :courses:456:2022:projects:456-2022-17:background_reading_presentation.pdf |}}
   * Project Final Presentation   * Project Final Presentation
-    * {{:courses:456:2022:projects:456-2022-01:final_poster_pdf.pdf|PDF of Poster}}+    * {{ :courses:456:2022:projects:456-2022-17:cis2_poster.pdf |}}
   * Project Final Report   * Project Final Report
-    * {{:courses:456:2022:projects:456-2022-01:final_report.pdf|Final Report}} +    * {{ :courses:456:2022:projects:456-2022-17:final_report.pdf |}}
-    * links to any appendices or other material+
  
 ======Project Bibliography======= ======Project Bibliography=======
Line 114: Line 120:
  
 ======Other Resources and Project Files====== ======Other Resources and Project Files======
-Here give list of other project files (e.g., source code) associated with the project.  If these are online give link to an appropriate external repository or to uploaded media files under this name space (2022-01).+The documentation and the working directory are in the project OneDrive.  The team is still figuring out way to include the directory here. 
 + 
 +The link here is the document for using the directory. 
 +{{ :courses:456:2022:projects:456-2022-17:how_to_use.pdf |}} 
 + 
 +The link here is for the project GitHub (currently private)
 +https://github.com/dusevitch/snare_control
courses/456/2022/projects/456-2022-17/project-17.1647539331.txt.gz · Last modified: by wwang153