Summary

The Revolving Needle Driver (RND) is a needle driver which can be attached to the end of an AcuBot, a Remote Center of Motion (RCM) module with five stages: Bridge-mount > Linear pre-positioning stage (XYZ) > Support Arm > RCM > RND. The RND excels at orienting, inserting and spinning a needle; it is also capable of measuring force. As it currently stands, there is a small but noticeable error ( 3mm ) in the location of the RCM. The RCM’s two axes of rotation are neither perpendicular nor intersecting, which causes it to move upon revolving either axis. This completely defeats the purpose of having an RCM, which offers the benefit of having a stationary pivot point around which it is possible to work. Since any error in the location of the RCM will cause even more errors to propagate along the linkage of the robot, a small displacement in the location of the RCM could lead to a very large displacement in the tip of the surgical device attached.

The goal for this project is to quantify and correct the RCM of the RND robot. We hope that by being able to track the tool tip very accurately with an optical tracker, we will learn how to build more precise and accurate RCM’s in the future.

Background, Specific Aims, and Significance

Many surgical robots today, such as the well-known da Vinci, have either mechanical or virtual RCM’s which allow them to operate in small spaces. By placing the RCM at the entry point in the patient, surgeons are able to obtain a very wide range of motion from a very small incision, which minimizes collateral tissue damage, blood loss, recovery time, scarring and infection. How much error is acceptable in the RCM is very much dependent upon the type of surgery being performed. For example, a 1mm difference in abdominal surgery is likely to be much less disastrous than a 1mm difference in ocular surgery. If RCM’s can be consistently and accurately maintained, surgeries requiring high precision will become much safer and easier to perform.

FPEki275WUc

Deliverables

Technical Approach


Polaris Tracker Accuracy Quantification
The manufacturer of the Polaris tracker states that the device has an error of 0.3mm, but they do not specify to what this 0.3mm refers to (overall displacement? Displacement in each cardinal direction?) Furthermore, they state nothing about the orientation of the markers. In order to determine a more accurate understanding of the capabilities of the tracker, we will use a highly accurate CNC machine to move the markers and give us a reference point. By using the CNC’s readings as the “expected” values (as the CNC has an accuracy on the order of a micron), we can better quantify the accuracy of the optical tracker.

In order to take the readings, the tracker is attached to the XY stage of the machine, and the marker is placed on the tool tip, or Z-stage. In doing so, we can precisely move the tracker and the marker to obtain readings in a 3D volume.

At each location within the CNC, 500 readings with the tracker are recorded. By doing so, the values can be denoisified and averaged to give a more accurate result that is unaffected by mechanical vibrations in the room. Furthermore, we hope to quantify the effects of taking readings at the trackers “sweet spot” and compare them to readings taken from other locations.

An extensive analysis on precision and accuracy, as well as repeatability of these tests will be performed. We also hope to test different types of trackers using our CNC method and compare the results.

RCM Error Quantification
Using the Polaris tracker, the RCM of the module will be observed in order to quantify the errors generated in the current state of construction. Markers will be placed at the tool tip, as well as a base reference, in order to more easily see the motion of the robot and its RCM. With the markers attached, the robot will be moved to several poses and orientations, taking measurements in a method similar to those of the CNC-comparison procedure. After performing these readings, we will have to two RCM axis locations relative to the tool tip in tracker space. We then want to compare these axis locations with the axis locations in our original CAD model.

Mechanical Dissection of the Robotic Needle Driver
The RCM of the RND robot will be partially disassembled and analyzed in order to study which factors contribute to the RCM error. The components of the robot, its link parameters, and axes of motion, will be compared with the ideal counterparts of the CAD model and corrected as much as possible, given the current design of the robot.

Dependencies

1. URobotics Laboratory Access

2. CNC Machine Time - Needed to quantify the tracker accuracy.

3. Time with RND - Needed to analyze, dissect, and fix RND.

4. Optical Tracker Time - Needed to calibrate tracker, measure errors, and implement the correction algorithm.

Member Responsibilities

Note: All members will work on most portions of the project, however, the responsibilities listed below are the lead roles of which the members will assume

Alex:

Changhan

Ryan

Member Dependencies

  1. GCode for Marker Tracking - Changhan must write the GCode for each marker tracking test using the CNC machine. Needed to run the CNC optical tracker tests.
  2. Serial Communication - Ryan must develop a program to allow the CNC machine and the optical tracker to communicate. Needed to run the CNC optical tracker tests.
  3. RCM error analysis – The optical tracker error analysis needs to be done before the RCM error analysis can be performed.

Milestones and Status

  1. Milestone name: Project plan presentation
    • Planned Date: 14-Feb
    • Completed Date: 14-Feb
    • Status: Done
  2. Milestone name: Optical tracker accuracy quantification
    • Planned Date: 10-Mar
    • Completed Date: 26-Mar
    • Status: Done
  3. Milestone name: Checkpoint Presentation
    • Planned Date: 27-Mar
    • Completed Date: 27-Mar
    • Status: Done
  4. Milestone name: Submitting abstract to Urology Engineering Society Conference
    • Planned Date: 30-Mar
    • Completed Date: 30-Mar
    • Status: Done
  5. Milestone name: Quantify the RND's RCM error
    • Planned Date: 8-Apr
    • Completed Date: 6-Apr
    • Status: Done. Initial error at 3.6mm. Current analysis shows less than 1mm.
  6. Milestone name: Mechanical dissection and analysis of the RND
    • Planned Date: 19-Apr
    • Completed Date: 13-Apr
    • Status: Done
  7. Milestone name: Correction reassembly and analysis of RCM module
    • Planned Date: 26-Apr
    • Status: Done Iterating analysis and correction to improve targeting.
  8. Milestone name: Systems Identification w/ Parameter Optimization
    • Planned Date: 5-May
    • Status: Done

Result

Polaris Optical tracking system Error Quantification

RCM Error Quantification

RCM Targeting Error Quantification

Management Plan

TIME LINE
(click to see in detail)

Reports and presentations

Project Bibliography

Other Resources and Project Files

Here is a link to our code and data: https://www.dropbox.com/s/sfve3dj5v9gcfkt/DATA_Copy.zip